Project Overview

About This Project

Woodside Apartments is a 232-unit, six-story multifamily building in North Miami Beach, constructed in 1973. After five decades of South Florida salt air, storm seasons, and sun, the building reached its 50-year recertification — the point at which Miami-Dade County requires a documented structural and electrical review and the repairs that follow. New Age Construction Group was hired to carry the building through that recertification with a full exterior restoration scope.

The work touched every exposed element of the building envelope. Every balcony was shored and its concrete repaired, and the original railings were replaced with new aluminum screened railings. The 1973-era sliding glass doors and windows were replaced throughout with new impact-rated units. Stucco was repaired, the façade restored, the building waterproofed, the pool deck waterproofed, and the exterior repainted.

The project was completed in 2026 with residents in place throughout — work phased stack by stack and elevation by elevation so the building stayed occupied and accessible. All work was performed by OSHA-certified crews under a state-certified general contractor (CGC#1531273) and documented for the recertification record.

Project Details

Location
North Miami Beach, FL
Service Type
Structural Repair & Restoration
Property Type
Multi-Family Residential
Building Size
232 Units · 6 Stories
Year Built
1973
Project Scope
50-Year Recertification — Full Exterior Restoration
Status
Completed — 2026
License
CGC#1531273
232
Units Restored
6
Stories
1973
Year Built
100%
Recertification Scope Delivered
What We Did

Scope of Work

A detailed breakdown of services performed on this project.

Balcony Shoring & Concrete Repair

Every balcony shored, deteriorated concrete removed to sound substrate, corroded reinforcement treated, and the slab edges and undersides rebuilt with structural repair mortar.

New Aluminum Screened Railings

Original railings replaced building-wide with new aluminum screened railing systems, set in repaired slab edges for a secure, code-compliant embedment.

Impact Sliding Glass Doors & Windows

Full replacement of the 1973-era openings with new impact-rated sliding glass doors and windows, bringing every unit to current Florida wind-load and impact standards.

Stucco Repair & Façade Restoration

Hollow and damaged stucco removed and rebuilt, cracks repaired, and the full façade restored and detailed to shed water.

Waterproofing & Pool Deck Waterproofing

Building envelope and pool-deck waterproofing systems installed to stop water intrusion at the source and protect the repaired concrete.

Exterior Painting & Final Recertification

Complete exterior repaint over the restored envelope, final walkthrough, and documentation delivered for the 50-year recertification record.

Gallery

Project Photography

A visual record of work performed throughout the project lifecycle.

Balcony shoring and slab-edge repair in progress
+

Balcony shoring and slab-edge repair in progress

Stucco repair and surface preparation — east elevation
+

Stucco repair and surface preparation — east elevation

Façade restoration under way with residents in place
+

Façade restoration under way with residents in place

Lift-access envelope work on the courtyard elevation
+

Lift-access envelope work on the courtyard elevation

Impact window and door installation
+

Impact window and door installation

Completed — new aluminum screened railings and finished façade
+

Completed — new aluminum screened railings and finished façade

Problem Solving

Challenges & How We Solved Them

Every project presents unique obstacles. Here's how our team approached the key challenges on this one.

Challenge

Balcony Repairs on Every Unit

All 232 units' balconies required shoring and concrete repair before the new railings could go in — the largest single line item in the recertification scope, and the one residents feel most directly.

Solution

Each balcony was shored, the deteriorated concrete removed and rebuilt, and the new aluminum screened railing installed in the repaired edge — phased stack by stack so no resident lost balcony access for longer than necessary.

Challenge

1973-Era Doors and Windows

The building's original sliding glass doors and windows were outdated, non-impact units that no longer met Florida's wind-load and impact requirements.

Solution

Full installation of new impact-rated sliding glass doors and windows throughout the building, coordinated unit by unit with residents and sequenced alongside the balcony work so each stack was opened once.

Challenge

An Occupied Building and a Full Envelope Scope

Balconies, railings, openings, stucco, waterproofing, pool deck, and paint all on one building, all while 232 units stayed occupied.

Solution

The scope was sequenced by elevation and stack, with access, noise, and dust managed around residents and the pool deck phased so the amenity reopened as early as possible.

Have a Similar Project?