Get a Free Assessment
South Florida condominium tower subject to a structural integrity reserve study

Structural Integrity Reserve Study Support in Miami & South Florida

A structural integrity reserve study (SIRS) tells your board what to repair and how to fund it. New Age Construction Group is the Miami structural restoration contractor that turns that report into executed, permitted repairs — phased to your reserve funding, coordinated with your engineer, documented for compliance.

State-Licensed GC — CGC#1531273
OSHA-Certified Team
Fully Insured & Bonded
4.950+ Google Reviews
500+ Structures Restored
25+ Years of Combined Experience
3 Counties Served
CGC#1531273 — State Certified
The Challenge

A SIRS Tells You What to Fix — Not Who Will Fix It

Florida's post-Surfside laws — SB 4-D in 2022, refined by SB 154 in 2023 and HB 913 in 2025 — require condominium and cooperative associations three habitable stories or higher to complete a Structural Integrity Reserve Study and to fund reserves for the structural components it covers. A study on a shelf doesn't protect the building: the flagged repairs still need a licensed contractor to execute them.

New Age Construction Group is the licensed contractor that does exactly that. We take the repairs your SIRS identifies — concrete, structural, waterproofing, and more — and execute them on a prioritized, phased plan, coordinated with your engineer, for associations across Miami-Dade, Broward, and Palm Beach County.

View Our Restoration Projects
Condominium board reviewing a structural integrity reserve study
25+ Years
Structural Restoration Experience
Condominium undergoing reserve-study-identified structural repairs
Free
Reserve-Repair Reviews
Is This You?

7 Signs Your Association Needs SIRS Repair Support

A reserve study is only as good as the work that follows it. If any of these apply to your association, it's time to turn findings into executed repairs.

Your building is a condo or co-op three stories or taller — SB-4D requires a SIRS for these buildings, and the reserves to fund the components it covers.

Your SIRS is complete and identifies repairs — a study on the shelf doesn't protect the building; the identified work still has to be executed.

Your reserves were historically waived or underfunded — SB-4D no longer allows waiving reserves for structural components, so catch-up repairs are likely.

Your milestone inspection flagged deficiencies — those repairs often overlap with SIRS-funded components and can be executed together.

Your study is due for its 10-year update — a maintained building studies and funds far more smoothly the next time around.

Your board is facing a special-assessment decision — a phased, prioritized repair plan helps manage the financial impact.

You need one contractor for a multi-component scope — concrete, structural, and waterproofing repairs handled by a single accountable team.

Sitting on a study full of repairs? Get a free review
What We Do

A SIRS Tells You What to Fix — We Execute It

Reserve specialists and professional engineers produce the study. Then the binder sits on a shelf unless someone builds the scope, pulls the permits, and does the work. That is New Age's role.

SIRS Repair Scope Execution

We take the components flagged in your study — with their remaining useful life estimates — and turn them into sequenced, permitted repair scopes with figures your board can budget against.

Structural & Concrete Repairs

Spalling repair, column and beam restoration, post-tension work — the load-bearing structural repairs that dominate coastal SIRS findings.

Waterproofing & Envelope Work

Deck coatings, sealants, exterior painting, windows and exterior doors, and roof coordination — the envelope items that protect every other component on the list.

Engineer & Board Coordination

We work under your engineer's specifications and present options to board members in plain English, so votes happen with clear numbers, not jargon.

Phased to Your Reserve Funding

Repairs sequenced across budget years to match your reserve contributions — urgent structural safety items first, cosmetic phases later — so special assessments stay a last resort, not the default.

Documentation & Compliance

Permits, engineering sign-offs, and closeout records that satisfy the building code, your insurer, and the next study.

What Is a Structural Integrity Reserve Study?

A structural integrity reserve study is a Florida-mandated study of your building's reserve funds: a licensed professional visually inspects the structural components of the condominium property, estimates the remaining useful life and replacement costs of each item, and produces a funding schedule so the association sets aside enough money, every year, to repair or replace them on time. In short, it is financial planning with an engineering backbone — a plan for building safety, not just a budget line.

The requirement came out of the Surfside condominium collapse in 2021, which exposed how years of deferred upkeep and underfunded reserves put lives at risk. Florida's legislature responded with Senate Bill 4-D in 2022, refined it with SB 154 in 2023 (which clarified who may perform the studies and how inspections are triggered), and updated it again with HB 913 in 2025. Together they rewrote the Florida Statutes on reserves — condominium associations under Fla. Stat. 718.112(2)(g) and cooperative associations under §719.106 — ending the era when boards could routinely waive reserves for structural items.

Who Needs a SIRS — and What It Must Cover

The SIRS requirements apply to every residential condominium or cooperative building in Florida that is three habitable stories or higher — associations that existed on or before July 1, 2022, and every one created since. Height is measured by habitable stories, so most of the mid-rise and high-rise condominium buildings along the Miami-Dade, Broward, and Palm Beach coastline qualify. Buildings under three stories are exempt, and commercial-only buildings fall under different rules such as the 40-year recertification. If you sit on a board, this is not optional homework: directors have a fiduciary duty to comply, and unit owners, buyers, and lenders can now look up your association in the state's public database.

The statute names the components the study must address: the roof; the structure — load-bearing walls and other primary structural members and systems; fireproofing and fire protection systems; plumbing; electrical systems; waterproofing and exterior painting; windows and exterior doors; and any other item whose deferred maintenance or replacement cost exceeds $25,000 and affects the building's structural integrity (a threshold adjusted for inflation — many older guides still cite the original $10,000 figure). For each, the report states condition, remaining useful life, and estimated replacement cost, then converts those numbers into recommended annual reserve contributions.

SIRS Deadlines, Frequency & Funding Rules

The deadline. Covered associations must have completed their initial study by December 31, 2025 (HB 913 extended the original 2024 date). Associations required to complete a milestone inspection on or before December 31, 2026 may complete the SIRS in conjunction with it — with both due by December 31, 2026. After the first study, a new one is required every 10 years.

Who can perform it. The visual inspection portion must be done by a licensed engineer, an architect, or a certified reserve specialist (Community Associations Institute) or professional reserve analyst (Association of Professional Reserve Analysts, APRA). HB 913 also added a conflict-of-interest disclosure rule for providers. New Age does not perform the study itself — by design. We execute the repairs, so your engineer's findings stay independent.

The funding rules. For budgets adopted on or after January 1, 2025, associations can no longer waive or reduce reserves for SIRS items below what the study recommends (budgets adopted on or before December 31, 2024 could still waive, but must fund per the study starting January 1, 2026). HB 913 gave boards practical flexibility: a baseline funding plan (reserves may fluctuate but never reach zero), a two-budget-year pause after a milestone inspection so repair costs are known before the numbers lock in, and the option — approved by a majority of the association's total voting interests — to meet funding requirements with a loan or line of credit instead of cash contributions alone.

Reporting. Completed studies must be reported to the DBPR (Department of Business and Professional Regulation) within 45 days, and the association's status is publicly visible in the SIRS Reporting Database. Associations were also required to open a DBPR online account by October 1, 2025 — and if a proposed budget's reserve funding no longer aligns with the most recent study, the association must obtain an updated SIRS before adopting it.

Miss the deadline and the board faces real exposure: breach of fiduciary duty claims, insurance and lending complications, and buyers who walk when the SIRS report is missing from the document package.

SIRS vs. Milestone Inspection

They're related but different obligations. The milestone inspection is an engineering inspection of structural safety — what's wrong today. The structural integrity reserve study is a financial plan: what it will cost to keep the building sound over the next decades. And the 40-year recertification is Miami-Dade and Broward's local building-code recertification of structural and electrical systems. The state programs feed each other — a completed inspection can pause the SIRS funding timeline for two budget years, and an association required to complete a milestone inspection by the end of 2026 may run its SIRS in conjunction with it, with both due by December 31, 2026.

The repairs each one identifies often overlap, which is exactly why a single contractor helps. If your building is coming up on any of these, our guide to milestone inspections in Florida and our 40-year recertification service explain the timelines in detail.

How We Execute Your SIRS Repair Scope

Once your study is in hand, we review the findings with your board and engineer, translate the identified components into a prioritized, executable scope, and phase the work to match how your reserves are funded — addressing the most critical structural and waterproofing components first. We perform the concrete, structural, and waterproofing repairs ourselves and document every phase.

For a board, the value is one accountable contractor who understands the SIRS process and turns a compliance document into a maintained, funded, code-ready building — with a record for the next study cycle.

Coastal Findings

What SIRS Inspections Typically Find in Coastal Buildings

Structural inspections in Miami's salt-air environment surface the same failures again and again:

Concrete Spalling

Concrete cracking and breaking away as the steel reinforcement inside it corrodes and expands in the salt air. See our concrete restoration service.

Waterproofing Failures

Failed deck coatings and sealants that let water reach the structure. See waterproofing.

Balcony Deterioration

The most common life-safety flag in coastal studies. See balcony repair.

Post-Tension & Structural Steel Corrosion

Hidden cable and reinforcement damage inside slabs. See post-tensioning repair and structural repair.

Catching these while they are maintenance items — before they become future repairs at full replacement cost — is the entire financial argument for the study.

Don't Wait

A Reserve Study Doesn't Protect a Building — Executed Repairs Do

Here's what's at stake when a SIRS's findings go unaddressed.

Special Assessments & Underfunding

When a SIRS reveals years of deferred structural maintenance, boards that haven't funded reserves face large special assessments. Executing the scope on a funded, phased plan softens the sticker shock.

Non-Compliance Exposure

For budgets adopted on or after January 1, 2025, associations can no longer waive or underfund reserves for SIRS components. Ignoring a study's findings is both a financial and a compliance risk for the board.

Deferred Repairs Compound

The components a SIRS flags don't wait. Addressing them on the study's timeline is far cheaper than emergency repairs after further deterioration.

Pricing Transparency

What Determines the Cost of SIRS-Identified Repairs

The study itself typically runs $2,000–$15,000, set by the engineering or reserve firm you hire — not by us. The repairs it identifies are the real number, and four factors drive it.

Scope of Identified Repairs

How many components are past their useful life, and how far deterioration has progressed.

Building Size, Age & Components

A 1970s 12-story tower on the sand carries different repair numbers than a 1990s garden mid-rise.

Phasing & Reserve Funding

Work matched to the funding schedule costs less than emergency mobilization after a failure or a code citation.

Engineering & Permitting

Structural work in Miami-Dade and Broward requires sealed drawings and permits; we carry that process, and it is priced into honest bids.

Every New Age proposal is free, itemized, and tied to a documented scope — once your study's repairs are defined, you'll see exactly what each component costs and how it phases against your reserves. No allowances that balloon later, no hidden fees.

Get your phased repair plan

Your study found the work and funded it. Let's get it executed.

Book a free, no-obligation reserve-repair review this week.

How It Works

From Reserve Study to Executed Repairs

A clear, structured process with no surprises at any stage.

01

Free Reserve-Repair Review

Send us your reserve study (and milestone report, if you have one); we review the flagged components at no cost.

02

Scoped, Phased Proposal

A repair scope with real pricing, sequenced to your reserves and budget years.

03

Permitted Execution

Licensed, insured, OSHA-certified crews perform the work under your engineer's oversight.

04

Documented Closeout

Records that satisfy the county, your insurer, your unit owners, and the next study.

Why New Age

The Reserve-Repair Team South Florida Boards Trust

OSHA-Certified Workforce

Every superintendent holds a 30-hour OSHA certification and all laborers complete 10-hour OSHA safety training. Safety is a core operating standard — not a checkbox.

State-Licensed & Fully Insured

Licensed General Contractor CGC#1531273. Fully insured with General Liability and Workers' Compensation coverage on every project.

Deep South Florida Expertise

We know Miami-Dade's and Broward's compliance landscape and Florida's SIRS statutes — 718.112(2)(g) and 719.106 — better than any out-of-state contractor.

One Team for a Multi-Component Scope

Concrete, structural, and waterproofing repairs handled by one accountable team — no juggling contractors to close out a reserve study.

Our Work

Reserve-Repair Projects We're Proud Of

Miami Beach Condominium Reserve-Repair Program
SIRS Repairs

Miami Beach Condominium Reserve-Repair Program

Miami-Dade County
View Project
Hollywood Association Structural & Waterproofing Scope
SIRS Repairs

Hollywood Association Structural & Waterproofing Scope

Broward County
View Project
Boca Raton Co-op Phased Reserve Repairs
SIRS Repairs

Boca Raton Co-op Phased Reserve Repairs

Palm Beach County
View Project
Florida Compliance

SB-4D, Reserve Funding & the SIRS Repair Mandate

Florida's post-Surfside laws (SB 4-D, SB 154, HB 913) require condominium and cooperative buildings three habitable stories or higher to complete a Structural Integrity Reserve Study by December 31, 2025 — or by December 31, 2026 in conjunction with a milestone inspection — and to fund reserves for the structural components it covers, with every completed study reported to the DBPR.

That means the work a SIRS identifies is mandated and funded — it just needs a licensed contractor to execute it. New Age performs the structural, concrete, and waterproofing repairs your study specifies, coordinated with your engineer, and documents it for compliance.

Ask About Your SIRS Repair Scope
3+Stories — condo and co-op buildings SB-4D requires a SIRS for
$25KThe deferred-maintenance / replacement threshold for components a SIRS must cover (adjusted for inflation)
10Years — the maximum interval between reserve study updates
Client Testimonials

What Boards & Property Managers Are Saying

Google Reviews4.9

"New Age Construction completely restored the structural damage on our building. Professional team, excellent communication, and the results exceeded our expectations. Highly recommend."

MR
Maria R.
Verified Google Review

"Great experience working with New Age Construction. They handled our structural repairs with expertise and care."

LK
Lisa K.
Verified Google Review

"Outstanding service from start to finish. The team was professional, efficient, and delivered exceptional results on our commercial project."

RM
Robert M.
Verified Google Review
4.9
Based on 50+ Google Reviews
Coverage Area

Reserve-Repair Support Across South Florida

We execute SIRS-identified repairs for condominium and cooperative associations throughout Miami-Dade, Broward, and Palm Beach County. If your board is working through a reserve study, we can help.

Miami-Dade County

Miami-Dade has the largest concentration of aging condo towers facing SIRS and reserve-funding decisions in the state. We execute reserve-study repair scopes across Miami, Miami Beach, Hialeah, Doral, and Homestead, coordinated with your engineer and board.

Broward County

We perform SIRS-identified structural and waterproofing repairs for condominium and cooperative associations in Fort Lauderdale and Hollywood and communities in Pembroke Pines, Miramar, and Sunrise.

Palm Beach County

From West Palm Beach to Boca Raton, Delray Beach, and Boynton Beach, we help boards turn their reserve study findings into executed, documented, code-ready repairs.

Sitting on a SIRS Full of Repairs?

Turn your reserve study findings into an executed, phased, funded repair plan. Schedule a free reserve-repair review today.

Call (786) 786-1006
FAQ

Frequently Asked Questions

Get Started

Request Your Free Reserve-Repair Review

Send us your study. Within 24 hours, our team will review the flagged components and schedule a walkthrough with your board or manager — no cost, no obligation. From structural repairs to waterproofing and envelope scopes, one licensed contractor carries the scope from reserve study to signed-off repairs.

Free review — no obligation
Response within 24 hours
Licensed GC on every project
Prefer to call?
(786) 786-1006

Tell Us About Your Building

By submitting this form you agree to be contacted by our team. We never share your information.